Systems - Specialist
The entry/exit gate of the Checkline II system is achieved by sliding along the sprung loaded outer cover which reveals the gate. The CLB trolley can then be passed over the thin section and slid onto the cable, the gate cover will close automatically when released. When closed the CLB & CLBR trolley passes over uninterrupted and without assistance. The end gate will be located at the end of a system on the loadcell or damper, it is usually installed where it is safe to disconnect from the horizontal lifeline.
EN 795 approved system
Discover Checkmate Safety, UK leaders in height safety and lifting equipment
Unit 1, Regis Industrial Estate, Dorset Road, Sheerness, Kent ME12 1LY
sales@checkmatesafety.co.uk
+44 (0) 2033 768 767
Opening Hours:
Weekdays : 08:00 – 17:00
Please call for deliveries and collections